Some Past Projects
Over the years, we have been fortunate to have been involved in a wide variety of interesting construction projects, ranging from individual residential developments and smaller building projects to major commercial buildings and some of the UK’s most recognisable landmarks.
Every project brings its own challenges, and we enjoy applying our surveying and engineering experience to help contractors, developers, architects and self-builders achieve the accuracy their projects demand.
Here are just a few examples of projects we have been involved with.
Olympic Stadium, London

SetPoint’s initial involvement in the London Olympic Stadium Wrap project was to undertake a verification survey of the stadium structure, checking the dimensions and geometry of the steelwork at the locations where the fabric wrap would interface with and connect to the structure.
Following this survey, SetPoint supplied the specialist installation teams and provided dimensional control in attendance throughout the installation, helping to ensure the accurate positioning and fitting of the wrap around the complex stadium geometry.
St George Wharf Tower, London

Standing 52 storeys tall, St George Wharf Tower is one of the tallest residential buildings in Europe.
SetPoint carried out an independent as-built survey of the entire concrete structure, providing the developer with accurate dimensional information as construction progressed floor by floor.
Using Leica total station equipment, operating in reflectorless laser mode, we surveyed the concrete structure accurately and efficiently. Survey control was transferred vertically through the building using plumb lasers.
One Hyde Park, London

SetPoint undertook a detailed internal dimensional survey of the penthouse apartment at One Hyde Park, one of London’s most prestigious residential developments.
The survey focused particularly on the glass cladding elements, providing accurate as-built dimensional information to the architect for the client’s approval ahead of the apartment fit-out.
Keston Park, Kent

SetPoint provided comprehensive surveying and setting out support during the construction of this unique detached private residence, incorporating complex structural steelwork and glass elements.
From initial setting out through to the accurate positioning and coordination of the various structural components, dimensional control was essential to achieve the required geometry of the building.
The project was featured on Channel 4’s Grand Designs.
Colchester Visual Arts Centre, Essex

Working closely with architect Rafael Viñoly, SetPoint used specialist CAD expertise and Leica total station equipment to survey and set out the geometrically complex elements of this £25m steel frame development.
A particularly challenging aspect of the project involved the auditorium roof, which was suspected of deflecting downwards. The intersections between the proposed sloping internal auditorium walls and the as-built roof therefore had to be accurately determined before the walls could be set out and constructed.
This required the existing roof geometry to be surveyed and analysed against the architectural design, translating complex three-dimensional relationships into practical setting out information for construction.
London and South East

Direct interrogation of CAD drawings and digital upload of coordinates to robotic surveying instruments enabled the error-free setting out of several thousand piles for the specialist piling contractor.
Medway Police HQ, Chatham

A full-time survey engineering team attended site for the duration of this £25m project with responsibility for the dimensional control of the steel frame office building, reinforced concrete cellblocks and 300-space car park constructions.
“… provided a professional and competent service throughout this contract and I would not hesitate to recommend them for future projects.” CT, Project Manager, Vinci
Health Club, Folkestone

Our foundation settlement monitoring service verified the vibro-compaction ground improvement before construction could commence.
A survey engineer then remained on site to support the main contractor on this £2.5m steel frame health club with swimming pool and car park.
“We thank you for your assistance in providing your engineering services and look forward to working with your company again in the near future.” DT, Project Manager, Galliford Try
University of Kent, Canterbury

The French Outinord “TunnelForm” formwork system was adopted for this £10m student accommodation project.
Chemically accelerated concrete and over-night heaters enabled concrete pouring/striking every 24 hours and demanded a high level of site engineering support.
River Centre, Tonbridge

Curved steel and glass facades and elliptical cast in-situ concrete staircases required accurate setting out on this £3.5m steel frame conference centre and car park.
A full-time site survey engineer was provided for the duration of this project.
British Museum, London

A team of welders and steel erectors were supervised for the specialist contractor installing over 3,000 individually cut panes of glass on Foster & Partners’ £6m “Great Court” steel and glass roof structure.
This project was featured on Tomorrow’s World.