Skip to content
Home » Some Past Projects

Some Past Projects

Olympic Stadium, London

London Olympic Stadium Wrap

Knowledge of the complex geometry of the stadium combined with specialist practical experience in steel erecting and fabric structures, put us firmly in place as the preferred installer of the Olympic Stadium Wrap.

More about this project

St George Wharf Tower, London

St George Wharf Tower

At 52 floors, this is one of the tallest residential buildings in Europe.

Our survey of the entire concrete structure provided the developer with independent and accurate as-built dimensional information as the construction progressed floor by floor.

One Hyde Park, London

One Hyde Park As-built Survey

Our as-built survey of the penthouse apartment in this high profile development was delivered to the architect in electronic CAD and hardcopy formats for the client’s approval prior to fit-out.

At £150m, this apartment was the most expensive in the World.

Keston Park, Kent

Keston Park

Accurate dimensional control was essential for the construction of this unique detached private dwelling with complex steel and glass elements.

This project is featured in Channel 4’s Grand Designs.

Colchester Visual Arts Centre, Essex

Colchester Visual Arts Centre Setting Out

Working closely with the architect, CAD expertise combined with high-end Leica survey equipment enabled the accurate surveying and setting out of geometrically complex building elements on this £25m steel frame project.

London and South East

Robotic Total Station Piles Setting Out

Direct interrogation of CAD drawings and digital upload of coordinates to robotic surveying instruments enabled the error-free setting out of several thousand piles for the specialist piling contractor.

Medway Police HQ, Chatham

Medway Police HQ Project Engineer

A full-time site engineering survey team attended site for the duration of this £25m project with responsibility for dimensional control of the steel frame office building, reinforced concrete cellblocks and 300-space car parks.

“… provided a professional and competent service throughout this contract and I would not hesitate to recommend them for future projects.” CT, Project Manager, Vinci

Bannatynes Health Club, Folkestone

Health Club Foundation Settlement Monitoring

Our foundation settlement monitoring service was utilised following the vibro-compaction ground improvement. A survey engineer then remained on site to work with the main contractor on this £2.5m steel frame health club with swimming pool and car park.

“We thank you for your assistance in providing your engineering services and look forward to working with your company again in the near future.” DT, Project Manager, Galliford Try

University of Kent, Canterbury

Tunnel Form Site Engineering

The French “TunnelForm” formwork system was brought in for this £10m student accommodation project.

Chemically accelerated concrete and over-night heaters enabled concrete pouring/striking every 24 hours and demanded a high level of site engineering support.

Whitefriars, Canterbury

Whitefriars Canterbury RC Concrete Frame Setting Out

This £50m development in Canterbury city centre incorporated basements and multi story car parks, ramps and lift shafts.

A team of setting out engineers was engaged to control the reinforced concrete works.

Harvester Centre, Tonbridge

Harvester Centre Tonbridge Site Engineering

Curved steel and glass facades and elliptical cast in-situ concrete staircases required accurate setting out on this £3.5m steel frame conference centre and car park.

A full-time site survey engineer was provided for the duration of this project.

British Museum, London

British Museum Great Court Steel Erecting and Welding

A team of welders and steel erectors were supervised for the specialist contractor to install over 3,000 individually cut panes of glass on Foster & Partners’ £6m “Great Court” steel and glass roof structure.

This project was featured on Tomorrow’s World.

Contact us today to discuss your project needs